Past Projects

Kryzsko Commons Phase III Addition

The Kryzsko Commons Renovation & Addition Project included a small expansion to the East side of the building, with extensive interior renovation to the Phase 3 portion of the building (including the existing Bookstore and Baldwin Lounge).

Sheehan Hall South, East and North Exterior Project

Over the past two years, WSU has completed full tuck pointing and window replacement on the south and north sides of the building.  These efforts addressed ongoing maintenance issues. WSU has completed one side of the building over the summer break starting in Summer 2013 and extending through Summer 2014.

Lourdes Hall Partial Re-roof

Over Summer 2014, WSU completed another phase of roof replacement on Lourdes Hall. This project included a complete replacement of the roof deck and clay tile roof system of the upper portion of the roof. The project also replaced the gutters and downspouts that serve these roof areas and included new snow guards to protect the entries below. Masonry wall areas were repaired and tuck pointed behind the gutter areas as needed. After the completed work, WSU is 80% complete with roof and gutter replacement on this building.  

Somsen 114 HR Office Renovation

WSU recently completed an interior renovation and upgrade of the WSU Human Resources Office Suite in Somsen Hall.  Work included the demolition of under utilized spaces to make way for new offices and work spaces.  The end result produced an updated appearance and more efficient space for the HR Department. This project was completed in March 2014.

PAC HVAC Phase II

Using state appropriated HEAPR funds, WSU completed the second phase of a building-wide HVAC upgrade project in the PAC.  This phase of the project included installing two new air handling units, eleven new exhaust fans, replacing ductwork, routing new piping to coils, replacing lights and ceilings. This work was completed over Summer 2013.